Actions
New Requirement #931
openMaterial Request Form – Auto Fetch Fields Based on Item Type
Start date:
Due date:
% Done:
0%
Estimated time:
Description
When selecting an Item in the Material Request form from the Item Master, fetch the necessary details as follows:
****If the selected item is a Finished Item, fetch:
**
Size-1 (Inch)
Sch-1
Material Grade
Nominal Wall Thickness-1 (MM)
Finished Weight
**If the selected item is a Raw Item, fetch:
**
Size-1 (Inch)
Sch-1
Material Grade
OD-1 (MM)
Nominal Wall Thickness-1 (MM)
OD Min
OD Max
No data to display
Actions